Difference between revisions of "Team:BOKU-Vienna/Notebook"

Line 882: Line 882:
 
<a href="#nxbfgr" id="Week 14" class="arrows" onclick="expand_collapse('14');"><pre><font size="+2"><b>Week 14</b></font> (02/10-06/10)</pre></a><span style="font-size:150%;"><b>  </b></span>
 
<a href="#nxbfgr" id="Week 14" class="arrows" onclick="expand_collapse('14');"><pre><font size="+2"><b>Week 14</b></font> (02/10-06/10)</pre></a><span style="font-size:150%;"><b>  </b></span>
 
<div id="14" class="yolo" style="display:none;">
 
<div id="14" class="yolo" style="display:none;">
<p>Everything we did in the fourteenth week...
+
<p>
<br>•</br>
+
<br>• Golden Gate Assembly of C-PPP_37, C-PPP_38, C-PPP_39</br>
 +
GG-products are then transformed into competent cells. Colonies with specific antibiotic resistances were selected out by using antibiotic-containing media. The next day, positives clones were confirmed via a OneTaq colony PCR and a gel electrophoresis before a Miniprep was made.
 
</p></div>
 
</p></div>
  
 
<a href="#nxbfgr" id="Week 15" class="arrows" onclick="expand_collapse('15');"><pre><font size="+2"><b>Week 15</b></font> (09/10-13/10)</pre></a><span style="font-size:150%;"><b>  </b></span>
 
<a href="#nxbfgr" id="Week 15" class="arrows" onclick="expand_collapse('15');"><pre><font size="+2"><b>Week 15</b></font> (09/10-13/10)</pre></a><span style="font-size:150%;"><b>  </b></span>
 
<div id="15" class="yolo" style="display:none;">
 
<div id="15" class="yolo" style="display:none;">
<p>Everything we did in the fifteenth week...
+
<p>
<br>•</br>
+
<br>• Lethality Test of C-PPP_38, C-PPP_39</br>
 +
<br>• Transformation of C-PPP_38, C-PPP_39 into <i>E.coli</i> with pSIM9 → made electro competent and induced with lambda-red</br>
 +
<br>• Integration: C-PPP_39 and GFPuv</br>
 
</p></div>
 
</p></div>
 
      
 
      

Revision as of 16:42, 31 October 2017

Notebook

V

Notebook.


All protocols we used for the methods can be found here: Protocol

For further information regarding our Golden Gate Assembly products, please refer to our part collection site.

Week 1 (03/07-07/07)
 
Week 2 (10/07-14/07)
 
Week 3 (17/07-21/07)
 
Week 4 (24/07-28/07)
 
Week 5 (31/07-04/08)
 
Week 6 (07/08-11/08)
 
Week 7 (14/08-18/08)
 
Week 8 (21/08-25/08)
 
Week 9 (28/08-01/09)
 
Week 10 (04/09-08/09)
 
Week 11 (11/09-15/09)
 
Week 12 (18/09-22/09)
 
Week 13 (25/09-29/09)
 
Week 14 (02/10-06/10)
 
Week 15 (09/10-13/10)