Difference between revisions of "Team:BOKU-Vienna/Notebook"

Line 284: Line 284:
 
Each PCR was loaded on a preparative gel and cut out before undergoing PCR-purification.
 
Each PCR was loaded on a preparative gel and cut out before undergoing PCR-purification.
 
<br><br>• Golden Gate Assembly of <a href="#BB1_09" class="bgscroll"> BB1_09</a>, <a href="#BB1_10" class="bgscroll"> BB1_10</a>, <a href="#BB1_11" class="bgscroll"> BB1_11</a>, <a href="#BB1_12" class="bgscroll"> BB1_12</a>, <a href="#BB1_13" class="bgscroll"> BB1_13</a>, BB2_01 (unsuccessful), <a href="#BB2_02" class="bgscroll"> BB2_02</a>, <a href="#BB2_03" class="bgscroll"> BB2_03</a>, <a href="#BB2_04" class="bgscroll"> BB2_04</a>, BB2_05 (unsuccessful)</br>
 
<br><br>• Golden Gate Assembly of <a href="#BB1_09" class="bgscroll"> BB1_09</a>, <a href="#BB1_10" class="bgscroll"> BB1_10</a>, <a href="#BB1_11" class="bgscroll"> BB1_11</a>, <a href="#BB1_12" class="bgscroll"> BB1_12</a>, <a href="#BB1_13" class="bgscroll"> BB1_13</a>, BB2_01 (unsuccessful), <a href="#BB2_02" class="bgscroll"> BB2_02</a>, <a href="#BB2_03" class="bgscroll"> BB2_03</a>, <a href="#BB2_04" class="bgscroll"> BB2_04</a>, BB2_05 (unsuccessful)</br>
GG-products are then transformed into competent cells. Colonies with specific antibiotic resistances were selected out by using antibiotic-containing media. The next day, positives clones were confirmed via an OneTaq colony PCR and a gel electrophoresis before a Miniprep was made.</br>
+
GG-products are then transformed into competent cells. Colonies with specific antibiotic resistances were selected by using antibiotic-containing media. The next day, positives clones were confirmed via an OneTaq colony PCR and a gel electrophoresis before a Miniprep was made.</br>
 
<br>• pSIM5 pre-cultures (DH5alpha + BL21(DE3))</br>
 
<br>• pSIM5 pre-cultures (DH5alpha + BL21(DE3))</br>
 
<br>• Transformation of HSM174 + pSIM5 (unsuccessful)</br>
 
<br>• Transformation of HSM174 + pSIM5 (unsuccessful)</br>

Revision as of 15:22, 1 November 2017

Notebook

V

Notebook.


All protocols we used for the methods can be found here: Protocol

For further information regarding our Golden Gate Assembly products, please refer to our part collection site. The list of our primers can be found here.

Week 1 (03/07-07/07)
 
Week 2 (10/07-14/07)
 
Week 3 (17/07-21/07)
 
Week 4 (24/07-28/07)
 
Week 5 (31/07-04/08)
 
Week 6 (07/08-11/08)
 
Week 7 (14/08-18/08)
 
Week 8 (21/08-25/08)
 
Week 9 (28/08-01/09)
 
Week 10 (04/09-08/09)
 
Week 11 (11/09-15/09)
 
Week 12 (18/09-22/09)
 
Week 13 (25/09-29/09)
 
Week 14 (02/10-06/10)
 
Week 15 (09/10-13/10)