Difference between revisions of "Team:Exeter/Current Methods"

Line 29: Line 29:
 
<h3><u>Pre-reaction chamber</u></h3>  
 
<h3><u>Pre-reaction chamber</u></h3>  
 
<h4>Mine water is mixed with recirculated sludge to encourage the formation of dense particles.<h2>
 
<h4>Mine water is mixed with recirculated sludge to encourage the formation of dense particles.<h2>
<img src="pre reaction chamber.JPG" height="50%" width="40%">  
+
<img src="https://static.igem.org/mediawiki/2017/5/5f/T--Exeter--prereaction.jpeg" height="40%" width="30%">  
 
<h3><u>Reaction Chamber </u></h4>
 
<h3><u>Reaction Chamber </u></h4>
 
<h4>A Lime Slurry is created from hydrated lime powder and is then added to the mine water for two purposes:
 
<h4>A Lime Slurry is created from hydrated lime powder and is then added to the mine water for two purposes:

Revision as of 12:20, 19 September 2017

.

Current Methods

Treatment at Wheal Jane

The current method of mine water treatment at the Wheal Jane site is provided by Veolia Ltd. The company, who operates under the Coal Authority, delivers the services and facilities to treat the water in addition to providing safe long term storage of the resultant hazardous residue from the treatment process.

Water is pumped from mine

10 stainless steel pumps costing £13,000 each are used to pump water from a mine shaft at rates up 330 l/s. The plant is separated into two distinct stream of treatment, so that if one fails the plant may continue treatment.

Pre-reaction chamber

Mine water is mixed with recirculated sludge to encourage the formation of dense particles.

Reaction Chamber

A Lime Slurry is created from hydrated lime powder and is then added to the mine water for two purposes: 1) to increase the pH of the acidic water to a target value of approximately 9.2 pH, 2) to cause the precipitation of metal ions. Air is circulated into the reaction chambers.

Lamella Clarifiers

A polymer is added to the mine water, binding to the metal it causes them to coagulate. Under the force of gravity the mixture separates out into distinct layers, the higher density sludge particles sink to the bottom and the water rises forming the top layer. The sludge is recirculated in the system until it reaches a specific density.

Clemows Valley Tailing Dam

When the Sludge reaches the required density it enters a holding tank and is later pumped to the Clemows Valley Tailing Dam. This is a 69m high Dam designed to contain hazardous waste. Over 17 years Veolia Treatment plant has deposited 7,002,000 tonnes of sludge.

(Nappin, 2017)

What are the problems with this current method of treatment ?


1)  Although the company does offer safe long term storage of the sludge by transferring it to a trailing dam it means that as result the waste containing toxic and hazardous chemicals is exposed to the environment.

2)   The process relies on the addition of a significant amount of lime in order to increase the pH so that elements such as Manganese can precipitate out, which occurs at pH 9.1. Quarried in Derbyshire, the lime must then be transported the 325 mile journey to Cornwall. This is a significant contribution to the plants carbon footprint and demonstrate how unsustainable methods like these are.

References

Nappin, C., 2017. Tour of Veolia [Interview] (10 8 2017).