Line 169: | Line 169: | ||
<td><b>July 2017</b></td> | <td><b>July 2017</b></td> | ||
<td></td> | <td></td> | ||
− | <td rowspan="2"> | + | <td rowspan="2">Cloning of influenza switch and trigger. <br> |
+ | into our standard backbine | ||
+ | Validate switch by co-transformation<br> | ||
+ | Cloning switch into shipping backbone</td> | ||
<td></td> | <td></td> | ||
</tr> | </tr> | ||
Line 184: | Line 187: | ||
<td><b>September 2017</b></td> | <td><b>September 2017</b></td> | ||
<td>.</td> | <td>.</td> | ||
− | <td> | + | <td>Mentored UCCKE high school team by providing advice on their project, troubleshooting routine lab problem and also helping them to analysis data.</td> |
− | <td></td> | + | <td>Hardware prototype design </td> |
</tr> | </tr> | ||
Revision as of 13:20, 13 October 2017