Line 185: | Line 185: | ||
− | |||
<a href="#adrfou" id="Week 2" class="arrows" onclick="expand_collapse('2');"><pre><font size="+2"><b>Week 2</b></font> (10/07-14/07)</pre></a><span style="font-size:150%;"><b> </b></span> | <a href="#adrfou" id="Week 2" class="arrows" onclick="expand_collapse('2');"><pre><font size="+2"><b>Week 2</b></font> (10/07-14/07)</pre></a><span style="font-size:150%;"><b> </b></span> | ||
<div id="2" class="yolo" style="display:none;"> | <div id="2" class="yolo" style="display:none;"> | ||
Line 199: | Line 198: | ||
<a href="#nxbfgr" id="Week 3" class="arrows" onclick="expand_collapse('3');"><pre><font size="+2"><b>Week 3</b></font> (17/07-21/07)</pre></a><span style="font-size:150%;"><b> </b></span> | <a href="#nxbfgr" id="Week 3" class="arrows" onclick="expand_collapse('3');"><pre><font size="+2"><b>Week 3</b></font> (17/07-21/07)</pre></a><span style="font-size:150%;"><b> </b></span> | ||
− | <div id="3" class="yolo" style="display:none;"><p> | + | <div id="3" class="yolo" style="display:none;"> |
+ | <p> | ||
+ | <br>• PCR: 27, 28</br> | ||
+ | Each PCR was loaded on a preparative gel and cut out before undergoing PCR-purification. | ||
+ | <br><br>• Golden Gate Assembly: BB1_14, BB1_15, BB2_01 (unsuccessful, with new BBa_23101 promoter), BB2_05(unsuccessful), BB2_06, BB2_07, BB2_08, BB2_09, BB2_10, BB2_12, BB2_14, BB2_15, BB2_16, CRISPR (unsuccessful)</br> | ||
+ | GG-products are then transformed into competent cells. Colonies with specific antibiotic resistances were selected out by using antibiotic-containing media. The next day, positives clones were confirmed via a OneTaq colony PCR and a gel electrophoresis before a Miniprep was made.</br> | ||
+ | <br>• Sent for Sequencing: BB1_14, BB1_15, BB2_01, BB2_05, BB2_06, BB2_07, BB2_08, BB2_09, BB2_10, BB2_12</br> | ||
+ | </p></div> | ||
<a href="#iqiuoy" id="Week 4" class="arrows" onclick="expand_collapse('4');"><pre><font size="+2"><b>Week 4</b></font> (24/07-28/07)</pre></a><span style="font-size:150%;"><b> </b></span> | <a href="#iqiuoy" id="Week 4" class="arrows" onclick="expand_collapse('4');"><pre><font size="+2"><b>Week 4</b></font> (24/07-28/07)</pre></a><span style="font-size:150%;"><b> </b></span> |
Revision as of 19:40, 28 October 2017
Notebook.
All protocols we used for the methods can be found here:
Protocol
Week 1 (03/07-07/07)
Week 2 (10/07-14/07)
Week 3 (17/07-21/07)
Week 4 (24/07-28/07)
Week 5 (31/07-04/08)
Week 6 (07/08-11/08)
Week 7 (14/08-18/08)
Week 8 (21/08-25/08)
Week 9 (28/08-01/09)
Week 10 (04/09-08/09)
Week 11 (11/09-15/09)
Week 12 (18/09-22/09)
Week 13 (25/09-29/09)