Difference between revisions of "Team:BOKU-Vienna/Notebook"

Line 721: Line 721:
 
<div id="8" class="yolo" style="display:none;">
 
<div id="8" class="yolo" style="display:none;">
 
<p>
 
<p>
<br>• PCR: DH5-α pSIM5, #71, #72</br>
+
<br>• PCR: #71, #72</br>
 
Each PCR was loaded on a preparative gel and cut out before undergoing PCR-purification according to protocol.
 
Each PCR was loaded on a preparative gel and cut out before undergoing PCR-purification according to protocol.
 
<br><br>• Golden Gate Assembly of <a href="#BB1_27" class="bgscroll"> BB1_27</a>, BB3_01 (unsuccessful), <a href="#BB3_03" class="bgscroll"> BB3_03</a>, <a href="#BB3_30" class="bgscroll"> BB3_30</a>, <a href="#BB3_31" class="bgscroll"> BB3_31</a>, <a href="#BB3_32" class="bgscroll"> BB3_32</a>, <a href="#BB3_33" class="bgscroll"> BB3_33</a></br>
 
<br><br>• Golden Gate Assembly of <a href="#BB1_27" class="bgscroll"> BB1_27</a>, BB3_01 (unsuccessful), <a href="#BB3_03" class="bgscroll"> BB3_03</a>, <a href="#BB3_30" class="bgscroll"> BB3_30</a>, <a href="#BB3_31" class="bgscroll"> BB3_31</a>, <a href="#BB3_32" class="bgscroll"> BB3_32</a>, <a href="#BB3_33" class="bgscroll"> BB3_33</a></br>

Revision as of 17:00, 1 November 2017

Notebook

V

Notebook.


All protocols we used for the methods can be found here: Protocol

For further information regarding our Golden Gate Assembly products, we refer to our part collection site. The list of our primers can be found here.

Week 1 (03/07-07/07)
Week 2 (10/07-14/07)
Week 3 (17/07-21/07)
Week 4 (24/07-28/07)
Week 5 (31/07-04/08)
Week 6 (07/08-11/08)
Week 7 (14/08-18/08)
Week 8 (21/08-25/08)
Week 9 (28/08-01/09)
Week 10 (04/09-08/09)
Week 11 (11/09-15/09)
Week 12 (18/09-22/09)
Week 13 (25/09-29/09)
Week 14 (02/10-06/10)
Week 15 (09/10-13/10)