Difference between revisions of "Team:Arizona State/Design"

Line 20: Line 20:
  
 
<p>
 
<p>
After determining our engineering goals and aims for this year's competition. Our team needed to do background research into quorum sensing to familiarize ourselves with the terminology going to be used for this competition. In addition to this, our team needed to reaffirm the 2016 ASU iGEM team's data collected from last year before going any further with designing our project. While confirming last year's team data, we discovered a major flaw in their design process of the receivers. These receivers were showed poor expression and only a select few were good enough to characterize. In addition to this, the system these receivers were cloned into did not show a good cloning ratio. In fact, it was very difficult to clone these receivers. After this, we realized we need to re-evaluate these receivers to determine whether it was the system we were cloning them in was bad, or the receivers themselves that needed to be redesigned.  
+
After determining our engineering goals and aims for this year's competition. Our team needed to do background research into quorum sensing to familiarize ourselves with the terminology going to be used for this competition. In addition to this, our team needed to reaffirm the 2016 ASU iGEM team's data collected from last year before going any further with designing our project. While confirming last year's team data, we discovered a major flaws while running their protocols. These receivers were showed poor expression and only a select few were good enough to characterize. In addition to this, the system these receivers were cloned into did not show a good cloning ratio. In fact, it was very difficult to clone these receivers. After this, we realized we need to re-evaluate these receivers to determine whether it was the system we were cloning them in was bad, or the receivers themselves that needed to be redesigned.  
 
</p>
 
</p>
  

Revision as of 23:50, 12 September 2017