Difference between revisions of "Team:UiOslo Norway/Timeline"

Line 83: Line 83:
 
                 <div class="timeline-blog overflow">
 
                 <div class="timeline-blog overflow">
 
                     <div class="timeline-date text-center">
 
                     <div class="timeline-date text-center">
                         <a href="" class="btn btn-common uppercase">Decided that our project would be about making a Bio-laser!</a>
+
                         <a href="" class="btn btn-common uppercase">Decided that our project would be about making a biolaser!</a>
 
                     </div>
 
                     </div>
  
Line 121: Line 121:
 
                                 <div class="post-content overflow">
 
                                 <div class="post-content overflow">
 
                                     <h2 class="post-title bold">Exam lull</h2>
 
                                     <h2 class="post-title bold">Exam lull</h2>
                                     <h3 class="post-author">Coordinated with external supervisors. Creates the script for parts searching. Decided on use of biological parts. Considered options for laser setup and sponsors. Extracted sfGFP from E. Coli, for use as proof-of-concept tests.</h3>
+
                                     <h3 class="post-author">Coordinated with external supervisors. Created the script for parts searching. Decided on use of biological parts. Considered options for laser setup and sponsors. Extracted sfGFP from E. Coli, for use as proof-of-concept tests.</h3>
 
                                      
 
                                      
 
                                     <div class="post-bottom overflow">
 
                                     <div class="post-bottom overflow">
Line 172: Line 172:
 
                                 </div>
 
                                 </div>
 
                                 <div class="post-content overflow">
 
                                 <div class="post-content overflow">
                                     <h2 class="post-title bold">In the summertime~~</h2>
+
                                     <h2 class="post-title bold">In the summertime</h2>
                                     <h3 class="post-author">InterLab take #2 (we had problems with our first attempt), successful this time. Landed sponsoring deal with OsloTech, scheduled to present at Cutting Edge festival. Agreeing on collaboration with teams from NTNU and Hefei. Started attempting transformations of E.Coli and cloning of parts into pSB1C3, and composite part into pJK148 (yeast expression vector).</h3>
+
                                     <h3 class="post-author">InterLab take #2 (we had problems with our first attempt), successful this time. Landed sponsoring deal with OsloTech, scheduled to present at Cutting Edge festival. Agreeing on collaboration with teams from NTNU and Hefei. Started attempting transformations of E.Coli and cloning of parts into pSB1C3, and composite part into pJK148 (yeast expression vector). Began the first attempts to make a proper laser setup. </h3>
 
                                      
 
                                      
 
                                     <div class="post-bottom overflow">
 
                                     <div class="post-bottom overflow">
Line 188: Line 188:
 
                 <div class="timeline-blog overflow">
 
                 <div class="timeline-blog overflow">
 
                     <div class="timeline-date text-center">
 
                     <div class="timeline-date text-center">
                         <a href="" class="btn btn-common uppercase">Starting experiments with laser setup</a>
+
                         <a href="" class="btn btn-common uppercase">Starting experiments with sfGFP in laser setup</a>
 
                     </div>
 
                     </div>
  
Line 204: Line 204:
 
                                 <div class="post-content overflow">
 
                                 <div class="post-content overflow">
 
                                     <h2 class="post-title bold">The dreaded end of summer</h2>
 
                                     <h2 class="post-title bold">The dreaded end of summer</h2>
                                     <h3 class="post-author">Presented for an expert group that provided feedback on our ideas. Landed sponsoring with Thorlabs, GATC and Senter for Digitalt Liv Oslo. Presented for bioscience master student and new physics students. Continued work on cloning, but facing problems. Heavy troubleshooting. Harvested a new batch of sfGFP. Participated in ethics discussion arranged by Uppsala iGEM.</h3>
+
                                     <h3 class="post-author">Presented for an expert group that provided feedback on our ideas. Landed sponsoring with Thorlabs, GATC and Senter for Digitalt Liv Oslo. Presented for bioscience master student and new physics students. Continued working on cloning, but facing problems. Heavy troubleshooting. Harvested a new batch of sfGFP. Participated in ethics discussion arranged by Uppsala iGEM.</h3>
 
                                      
 
                                      
 
                                     <div class="post-bottom overflow">
 
                                     <div class="post-bottom overflow">
Line 225: Line 225:
 
                                 <div class="post-content overflow">
 
                                 <div class="post-content overflow">
 
                                     <h2 class="post-title bold">Presentations, frustrations and collaborations</h2>
 
                                     <h2 class="post-title bold">Presentations, frustrations and collaborations</h2>
                                     <h3 class="post-author">Held poster session at the Cutting Edge festival. More cloning and troubleshooting. Visits NTNU to hold mock presentation, and teams up for collaboration.
+
                                     <h3 class="post-author">Held poster session at the Cutting Edge festival. More cloning and troubleshooting. Visited NTNU to hold mock presentation, and team up for collaboration.
 
</h3>
 
</h3>
 
                                      
 
                                      
Line 260: Line 260:
 
                                 <div class="post-content overflow">
 
                                 <div class="post-content overflow">
 
                                     <h2 class="post-title bold"><a href="#">Wrapping up</a></h2>
 
                                     <h2 class="post-title bold"><a href="#">Wrapping up</a></h2>
                                     <h3 class="post-author">Manages to successfully clone composite part and nmt1 into submission vector. Equipment from Thorlabs arrive, able to test laser setup with mirrors on both sfGFP-expressing yeast and a extracted protein solution. Presented our work to the Norwegian Minister of Education.
+
                                     <h3 class="post-author">Managed to successfully clone composite part and nmt1 into submission vector. Equipment from Thorlabs arrived, were able to test laser setup with mirrors on both sfGFP-expressing yeast and a extracted protein solution. Presented our work to the Norwegian Minister of Education.
 
  Wrapping up collaboration with Hefei and NTNU. Finishing the wiki. </h3>
 
  Wrapping up collaboration with Hefei and NTNU. Finishing the wiki. </h3>
 
                                      
 
                                      

Revision as of 03:35, 2 November 2017



Feb

Team Building Activities


March

Brainstorming for Projects


April

The real work begins...


May

Exam lull


June

Parts design and InterLab Study


July

In the summertime


Aug

The dreaded end of summer


Sept

Presentations, frustrations and collaborations


Oct

Wrapping up


Nov

The great jamboree!

(image by: iGEM Foundation, Justin Knight)