Important events:
  • 6.26: Got the synthetic parts and started experiments.
  • 7.23: Lysin’s test had been finished.
  • 7.29: Light-controlled system had been found wrong.
  • 9.3: Newly synthetic light-controlled system arrived.
  • 9.17: New light-controlled system had been tested.
  • 9.29: Two parts had been combined.
  • 10.11:The whole system was tested successfully.